Fagioli installs bridge

By Christian Shelton26 February 2018

04 overview

The central span of the bridge weighed over 2,000 tonnes

The Indonesian branch of Italian heavy lifting and transport company Fagioli has announced the successful completion of the first part of a bridge installation.

02 load out

The bridge being loaded onto the barge

PT Fagioli Lifting and Transportation Indonesia loaded the central span of the bridge onto a barge in Surabaya, Java Island, Indonesia.

The bridge weighed over 2,000 tonnes and measured 128 metres long.

01 transport

The central span of the bridge measured 128 metres

The barge then sailed to Jayapura, Papua, Indonesia, where it was lifted off using four Fagioli strand jacks, providing a total lift capacity of 4,800 tonnes.

03 installation

Latest News
Recovery by crane
New 100 tonne capacity Tadano AT proves itself first time out by salvaging an overturned excavator
New Link-Belt representative in Turkey
Neftas of Istanbul, Turkey, announced as Link-Belt representative
Falcon launches ‘smaller’ series
The Sigma series sits under Falcon’s existing working height range and is produced under a new partnerhship