LEK Sloopwerken demolishes concrete bridge

By Leila Steed03 November 2020

The MBI CR140R crusher demolishes the concrete bridge

The MBI CR140R crusher demolishes the concrete bridge

Netherlands-based demolition company LEK Sloopwerken has crushed 2.000 cu m (70,000 sq ft) of concrete in just 48 hours, as part of a bridge demolition project.

LEK Sloopwerken, a sustainable demolition company that operates internationally, used a specialist 140 t crusher attachment manufactured by MBI Group subsidiary Mantovanibenne to undertake the viaduct works.

The CR140R attachment was custom-built for the demolition of reinforced concrete and is equipped with double cylinders, a twin-pin system and rebar cutting blades. 

LEK Sloopwerken used mounted the CR140R on a Liebherr 974 excavator in order to carry out the high-reach works, which were undertaken using only low-noise equipment due to bridge’s urban location.

Latest News
Boels orders 600 Atlas Copco compressors
Order includes plug-and-play, electric-powered portable compressors for low emission zones
Initial works contract for US$6.6 billion Australian rail link
Laing O’Rourke has been awarded the Initial Works and Early Works package for Suburban Rail Loop in Australia
Business leaders’ recognition for waste company MD
UK’s Institute of Directors honours Jacqueline O’Donovan at annual awards event