London City Airport project

26 September 2018

 

A new video from London City Airport, UK, illustrates the scale of the engineering project now underway in King George V Dock, as the £480 million (€538.5 million) City Airport Development Programme gathers pace.

Peter Adams, London City Airport’s chief development officer, introduces the two-year piling and decking phase alongside Dave Bolger, a section engineer from BAM Nuttall.

Latest News
Is better progress management the secret to successful projects?
Jean Luc Ozoux looks at why some companies report that they have not met planned timelines or budgets
Former FIEC director general Ulrich Paetzold dies
Former director general of the European Construction Industry Federation (FIEC) Ulrich Paetzold passed away on 20 April.
Bechtel: ‘The future of construction is digital’
Bechtel highlights how they are utilising technology on the Cutlass Solar project in Texas, US