Mumbai, India-headquartered logistics specialist Express Global Logistics transported a 38-metre long Amine gas treatment regenerator approximately 1500 kilometres from north west India to south east India. The journey took 30 days. To move the equipment a 14-axle trailer with a 10 metre spacer in the middle was used. A detailed route survey was carried out prior to the transport job and challenges included rough terrain, steep gradients, tight turns and obtaining multiple permissions. The transport also took place over a period of national lockdown in India, adding to the challenges.

2

The Amine gas treatment regenerator measured 38 metres long

1AAA

A 14-axle trailer with a 10 metre spacer in the middle was used

4

Challenges on the route included rough terrain, steep gradients, tight turns and obtaining multiple permissions

3

The journey took 30 days

 

 

Newsletter

Delivered directly to your inbox World Crane Week features the pick of the breaking news stories, product launches, show reports and more!

Sign up for free

Newsletter

Delivered directly to your inbox World Construction Week features the pick of the breaking news stories, product launches, show reports and more!

Go to newsletters