Wet work for TweWe-Bau

12 February 2015

The 673 telescopic crawler sets sheet pile walls for the new slipway in the North Sea spa town Neuha

The 673 telescopic crawler sets sheet pile walls for the new slipway in the North Sea spa town Neuharlingersiel

Construction company TweWe-Bau put a Sennebogen 673 telescopic boom crawler crane to work on the development of a new slipway in Neuharlingersiel, Germany.

During the first stages of construction, the crawler was used to place 21 metre long sheet pile sections prior to them being driven into the ground at a later stage.

Challenges for the crane include operating in up to one metre of water and working in a tidal environment.

The crane was leased from service and sales partner Tecklenborg Baumaschine. Capacity is 70 tonnes and its full-power boom is 36 m long. The wide-gauge crawler undercarriage allows it work in the water, the manufacturer said. Power comes from a 168 kW emissions level 4 diesel engine.

Latest News
Open-S wins at 2024 Innovation Awards
Alliance of OEMs celebrate milestone win for tiltrotator and quick coupler global standard
Chinese tunnelling contractor claims new record on Georgia highway tunnel drive
China Railway Tunnel Group has claimed what it said was a new record tunnel boring machine tunnelling (TBM) during the construction of a tunnel on a major new highway in Georgia.
Intermat Innovation winners announced
Winners of the Intermat Innovation awards were announced at a ceremony after the first day of the show in Paris, with Bomag, Moog, Tenstar, Dynaset and Betolar winning the coveted gold awards.