ai01020717.xml

15 April 2008

Mast climbers are rapidly carving out a niche in chimney work, whether refurbishment or demolition. In this case, ASClimber is using its new XM H heavy duty products – developed by XL Developpement – to dismantle a chimney near Paris. The XM H gives contractors a number of options: 9 t of payload with chimneys with diameters of 2.0 m to 4.5 m, 8 t payload for 4.5–7.5 m diameters, and 6 t with 7.5–11.5 chimneys. Elevation speed is 12 m/min, the platforms are 2 m wide and the maximum working height is 250 m. The XM H system can also be configured as a passenger/materials hoist with 2–3 t capacity or a transport platform/material hoist with 4.5 t capacity (twin masts). ASClimber also distributes a light duty XM L version of the modular system.

Latest News
Back to nature: Tadano telecrawler tackles state trail project
Waukesha, WI-based Zenith Tech helped repair a bridge along the 52-mile Glacial Drumlin State Trail that runs between Milwaukee and Madison.
Holt joins Engineered Rigging team
Jay Holt, PE and PMP, has ben named director of assets and engineering for the equipment rental company. 
Q2 sales slip for Volvo CE, but China begins to recover
Equipment sales are down but order intake is up in the second quarter, and China has seen