Boom goes underground

12 April 2010

UpRight AB38 boom supplied by LTECH goes to work on a new station in the Saint Petersburg metro.

UpRight AB38 boom supplied by LTECH goes to work on a new station in the Saint Petersburg metro.

Russian contractor Upravleniye Mekhanizacii Metrostroy is using an UpRight AB 38 articulated boom in the construction of a metro station on the Saint Petersburg Metro.

The machine was rented from LTECH and is currently being used to install cabling and communications systems within the tunnel and mounting the tunnel shield in the Ligovskiy Prospect station.

This tunnel shield, believed to be the only one of its kind in Russia was specially made in Germany for sinking the shafts of metro tunnels under residential buildings, which have a historical value. The shield is not designed for great depths but for difficult conditions where the ground is weak and for under the Saint Petersburg - Obvodny Canal.

Latest News
Kaeser shows ‘study’ for electric compressor
Machine produced to generate discussion about electric products
Hochtief subsidiary increases stake in mining services firm
Hochtief’s Australian subsidiary Cimic has increased its stake in mining services company Thiess, in response to the importance of the energy transition.
Hitachi to showcase partnerships
Technology firms work with OEM to develop cutting edge excavators