Crane forest
22 May 2008
Mammoet is working on several large projects in Saudi Arabia, Qatar, the United Arab Emirates, Kuwait and Oman. At the Rabigh site, Mammoet started a major heavy lifting project by installing an 880 tonne regenerator on a 15 m-high foundation, using the MSG II gantry lifting system (in yellow). On the same site, the PTC 1 lifted a VDU column weighing 825 tonnes onto a 26 m pedestal.
Latest News