Dingli to introduce a new range of scissors at Bauma China

By Maria Hadlow12 November 2010

One of Dingli's new electric scissors JCPT1012.

One of Dingli's new electric scissors JCPT1012.

Chinese aerial work platform manufacturer, Zhejiang Dingli Machinery Co Ltd, will be introducing a series of new machines during Bauma China. Most of the new and improved machines will be scissor models.

The new hydraulic drive scissors, JCPT0808HD, JCPT1008HD, JCPT1012HD and JCPT1212HD will replace the older models JCPT6 (II), JCPT7.4 (II), JCPT8 (I) and JCPT9.5 (I). These new models will be on display and Dingli will encourage visitors are invited to test drive these machines.

Dingli will also be showing electric scissors, which include JCPT0808DC, JCPT1008DC, JCPT1012DC and JCPT1212DC. JCPT0807DC, a narrow machine with a working height of 7.8 m will also be demonstrated.

A smaller version of self-propelled and push-around scissors designed for ease of maintenance and better stability will be displayed, the JCPT3.0 (III), JCPT3.0 and JCPT3.9.

To complete the range of scissor products, a new compact rough terrain range with safe working load of 567 kgs will also be shown. These 2 models, JCPT1017RT and JCPT1217RT are intended to impress visitors the ease of maneuverability and access of key components.

Bauma China will also be a showcase for Dingli's new GTBZ38S boom lift. designed for shipyard operation. The key feature of this model is the rotating jib, which increases flexibility and allows access to a greater working area.

Dingli has lately increased the number of engineering personnel at its plant and production space by 88000 m2.

Latest News
Trackunit expands Kin functionality
New capability collects movement data from tagged assets in real time
GCCA reveals 7 ways to reach concrete ‘Net Zero’
The world’s leading cement and concrete manufacturers have made a global commit to cut CO2 emissions by a further 25% by 2030
How did Saudi Aramco perform this major lift at Fadhili gas plant?
Early 2021 saw a critical lift performed at the Fadhili gas plant in Saudi Arabia when a reboiler tube was removed for inspection. Mustafa Al Abdulmohsin reports