Dockwise sets 30,000 tonne record

19 December 2012

Dockwise SHWE Topside Tow

Dockwise SHWE Topside Tow

Dockwise has completed a record-breaking installation of a fully integrated SHWE platform for the offshore oil and gas industry.

The mega topside, Block A-1 SHP Topside, which includes an hotel and restaurant, weighed nearly 30,000 tonnes and was installed using a float-over method. Dockwise Ltd installed the topside by operating a COOEC installation launch barge, the HYSY229.

The main tow arrived in the SHWE Field, in the Bay of Bengal, on 8 December 2012 after travelling nearly 4,000 nautical miles from Hyundai Heavy Industries’ (HHI) fabrication yard in Ulsan, Republic of Korea.

Alex Rodenburg, senior project manager, said, “The successful SHWE topside installation and jacket launch mark a significant milestone for Dockwise. This further validates Dockwise's evolution into an offshore contracting partner for the transport and installation of oil and gas platforms.”

Latest News
Jury concludes that Caterpillar owes $100m to importer amid US lawsuit
A jury in the US has concluded that Caterpillar must pay $100 million to an importer, following a legal dispute between the two companies.
Kanamoto eyes North America move
Company aims to double overseas revenue in next six years
Smart Construction to unveil Edge 2 at Intermat
New launch ‘an advancement’ in simplifying drone surveying processes and point cloud data processing