ic080735.xml

19 March 2008

The semi-submersible crane vessel Thialf removing the Edda Flare Platform, part of the greater Ekofisk complex

A new 3,000 tonne 30 m test rig gives a UK-based engineering company and spreader manufacturer increased capabilities in the building and testing of high capacity load spreader beam systems. IC reports

Latest News
ITER announces new construction timetable
ITER says “technically robust operations” including deuterium-deuterium fusion production will take place 2035
Sinoboom 60m reaches Australia
Tallest Sinoboom lift to be available in Australia 
IRN100: survey reveals rise in revenues and CapEx
Revenues for the top 100 reach €73 billion for 2023