Lifthing uses Enerpac gantry at Belgian hospital

By Christian Shelton22 November 2018

Belgian industrial installation company Lifthing has completed the installation of proton therapy units at the University Hospitals Leuven (UZ Leuven) – Belgium’s first proton therapy centre, located at UZ Leuven’s Gasthuisberg campus.

Lifthing Enerpac SBL500 for proton theraphy unit installation mid-res

Two units weighing 57 tonnes and a 75 tonne unit were installed by first skidding them along the tracks of Lifthing’s Enerpac SBL500 gantry. The gantry was then used to lower them into position. According to Lifthing, it used a gantry rather than a mobile crane due to space restrictions in the clinical treatment bunkers.

“Gentle and accurate handling was essential when handling the synchrocyclotrons and therapy unit,” said Pieterjan Van Iseghem, managing director at Lifting. “The Enerpac SBL500 gantry, equipped with header beam, powered side shifts and wireless control, gave us the lifting capability and precise positioning we needed for this important project.”

Lifthing Enerpac SBL500 for proton theraphy unit installation A

 

Latest News
US$8 billion transport investment by EU
EU to make available €7 billion for transport infrastructure projects, including deployment of alternative fuels infrastructure
Magni opens new facility in Texas
Located in Pasadena, TX, the new Magni location will serve as the company’s main spare parts and machine distribution facility for North America
Zoomlion exports China’s largest crawler crane
Export of the ZCC32000 crane is the third time Zoomlion has broken the record for the highest capacity crane exported from China