Local business for Geda

16 July 2013

A Geda SH 2000 industrial lift provides access to the preheater tower for the Märker cement works in

A Geda SH 2000 industrial lift provides access to the preheater tower for the Märker cement works in Harburg, Germany

Geda is working with local cement works Märker, in Harburg, to provide access to its 70 m high preheater tower.

A Geda SH 2000 transport platform is being used to reach the nine landings of the tower where workers carry out essential maintenance work as and when required.

The Geda SH 2000, with its 4.3 m2 car, has a rated capcity of two tonnes and provides enough space to transport bulky and heavy parts.

On each of the nine landings special Geda landing level safety gates and landing enclosures have been installed at the entry and exit points.

Latest News
Leica Geosystems launches its first Machine Smart Antenna at Intermat 2024
Leica Geosystems new smart antenna is designed with scalable and flexible machine control solutions
Tutor Perini subsidiary lands $72.7m Pensacola International Airport job
Tutor Perini subsidiary Roy Anderson Corp has landed a $72.7 million contract to build a new hangar at Pensacola International Airport in Florida, USA.
Yanmar outlines compact equipment ambitions
Developing dedicated electric platforms for compact machines