XCMG MEWPs onsite in Russia

By Euan Youdale26 January 2021

XCMG boom lift, Amur Gas Treatment Plant Project (AGPP), Russia XCMG boom lift onsite at Russia's Amur Gas Treatment Plant Project (AGPP).

In Blagoveshchensk, the capital of the Russian Amur Region, the construction of the Amur Gas Treatment Plant Project (AGPP) is steadily proceeding, with XCMG boom lifts playing an important role. 

Under the Sino-Russian Natural Gas Supply Agreement, once completed the plant will supply natural gas for the long-term needs of Eastern Siberia and the Far East.

The project must adere to strict Russian national requirements for aerial work and XCMG MEWPs have been supplied to support this effort.

XCMG boom, Amur Gas Treatment Plant Project (AGPP), Russia

Included onsite are the Chinese manufacturer’s bigger boom lifts with a large working range, chosen to provide a more flexible and stable working experience for the operator. XCMG’s energy-saving system reduces the overall fuel consumption by more than 30%, says the company, even on extremely cold wprk sites.

In the Covid-19 environment, XCMG remotely tracks its products and offers real time responce to any questions that arise onsite. As a result, XCMG says it has gained wide praise from Russian customers for its service provision. 

Latest News
Allied Crane Hire adds mobile crane to fleet
The crane and heavy transport company Allied Crane Hire has taken delivery of a Liebherr LTM 1230-5.1
Himoinsa to launch battery power genset
EHR Battery Power Generator range offers up to zero emissions and lowers fuel costs through efficient energy use
Rental rate rises assist Sunbelt to pre-Covid revenue levels
Sunbelt Rentals’ first quarter revenue up 22% on 2020 and 12% on 2019, partly thanks to increasing rental rates