London 2012: Aquatics Centre roof lift

08 May 2009

Work is under way lifting the 2800-tonne wave-shaped roof of the Zaha Hadid designed London 2012 Aquatics Centre. The lift is considered one of the most complex engineering and construction challenges of the Olympic Park ‘big build’. When complete the 160 m long column-free and up to 90 m wide roof will rest on two concrete supports at the northern end and a 28 m long and 5 m wide, supporting ‘wall’ at its southern end.
Latest News
Ausa looks to the future with electric machines
OEM plans new machines by 2025
Kaeser shows ‘study’ for electric compressor
Machine produced to generate discussion about electric products
Hochtief subsidiary increases stake in mining services firm
Hochtief’s Australian subsidiary Cimic has increased its stake in mining services company Thiess, in response to the importance of the energy transition.