Raising a glass with Peri

Premium Content

24 April 2008

These fantastic pictures show a Peri scaffolding system being used on the spectacular new Hotel Marques de Riscal in the Rioja region of Spain, designed by architect Frank Gehry and commemorating the wine culture of the region.

Peri Up scaffolding on a 2 x 2 m grid provided access while constructing the 1800 m2 titanium roof of the €60 million building, and Peri formwork and shoring was also used throughout the 100000 m2 construction project.

The hotel, located to the west of Pamplona and part of de Riscal's 'City of Wine', has now opened.

Building operational resilience in industrial engine applications
The hidden costs of equipment downtime start long before failure
Parked in plane sight: Why GSE fleets rely on large spark-ignited engines
Examining how proven technology can help airport fleets balance uptime, cost, flexibility and lower emissions
Accessing aging infrastructure: Choosing the right AWP for the application
How site conditions determine which aerial work platform is best suited to the project