Raising a glass with Peri

Premium Content

24 April 2008

These fantastic pictures show a Peri scaffolding system being used on the spectacular new Hotel Marques de Riscal in the Rioja region of Spain, designed by architect Frank Gehry and commemorating the wine culture of the region.

Peri Up scaffolding on a 2 x 2 m grid provided access while constructing the 1800 m2 titanium roof of the €60 million building, and Peri formwork and shoring was also used throughout the 100000 m2 construction project.

The hotel, located to the west of Pamplona and part of de Riscal's 'City of Wine', has now opened.

How to influence construction buyers in an AI world
The buyer journey is now more complicated than ever before, thanks to the AI world. What should construction marketers do to reach their buyers?
A smart cold play: How cold milling can offer a better bottom line for Latin American road contractors
Faced with tight margins, operator shortages and calls for more operational transparency, highway contractors are embracing digitalisation in their cold milling applications
How smarter milling can boost productivity for Latin American road contractors
As contractors across the region face tighter margins, operator shortages and growing demands for transparency, automation and digitalisation are becoming increasingly important in cold milling operations