Prefferred bidder status for US$ 3.4 billion of renewable energy schemes
23 May 2012
The South African Department of Energy has granted preferred bidder status to 19 renewable energy projects, with a total generation capacity of 1.04 GW. The total project cost of the solar, wind and hydro-electric schemes is put at ZAR 28.1 billion (US$ 3.4 billion).
The schemes were awarded under the…