Barin sets up on Thuan Phuoc

Premium Content

19 May 2016

Barin AB 16/S on the Thuan Phuoc Bridge in Thailand. 

The bucket-type

Barin AB 16/S on the Thuan Phuoc Bridge in Thailand. The bucket-type

A new bridge inspection unit from Barin has been put to work on the Thuan Phuoc Bridge in Thailand.

The bucket-type AB 16/S is mounted on a Volvo FM, 370 hp chassis. Its main technical features include a horizontal underbridge reach of 16m, maximum overhead reach of 18.4m, vertical depth unberbridge of 21.6m and the ability to operate over 3.9 m barriers and a sidewalk clearance of 3.8m. Payload is 250 kg.

It was delivered at the beginning of May to customer Danang Municipality mainly for the inspection of the famous Da Nang (Dragon Bridge). But, for now, is working on the Thuan Phuoc, a suspension bridge spanning the Han River, which flows into Danang Bay.

The bridge’s length is 1856m, making it the longest suspension bridge in Vietnam, boasting a width of 18m and four traffic lanes.

The evolution of electromobility in construction
The case for electric construction equipment is now as much about productivity and business value as it is about sustainability
Why crawler AWPs are becoming essential to modern mining and tunnelling
While excavators, loaders and TBMs dominate the spotlight, crawler aerial work platforms are quietly transforming how mining and tunnelling projects are built, maintained and operated.
Beyond the logo: Why content is the engine of successful B2B brand transformation
KHL Content Studio’s Jon Abrahams on how a new identity may capture attention, but it’s understanding that builds trust