Sankyu bridge project

Premium Content

02 August 2017

Sankyu bridge project

The 40-metre-long, 50 tonne bridge being moved through central Nagasaki

Japanese logistics, engineering and heavy lift specialist, Sankyu, has transported a prefabricated bridge – weighing around 50 tonnes and with a length of 40 metres – across the centre of the Japanese city of Nagasaki. The bridge now connects Nagasaki and the island of Dejima, in the bay of Nagasaki.

To transport the bridge through the densely-built urban area Sankyu used 12 lines of self propelled modular transporter from Scheuerle, part of German heavy load transportation specialist Tii Group. “Sankyu has been relying on self-propelled transport solutions from Tii Group for a long time,” said Ralf Grützmacher, area manager sales at Tii Sales responsible for the Asian markets. “Manoeuvring the 40 metre long Dejima bridge through the old town of Nagasaki required experience and precise vehicle control. Here, our vehicles along with the Sankyu specialists did an excellent job.”

According to the Tii Group, Sankyu has been a long-standing customer and has more than 250 of its SPMT axle lines.

 

Accessing aging infrastructure: Choosing the right AWP for the application
How site conditions determine which aerial work platform is best suited to the project
The evolution of construction site safety: Why smart machines matter
Intelligent intervention that can help contractors prevent incidents without compromising productivity
How smart equipment is improving jobsite productivity
In the face of rising costs, tighter margins and labor shortages, there has never been a greater need to make the best use of every hour on site