H.E. Services orders 85 Mecalac dumpers

Premium Content

03 December 2018

UK rental company H.E. Services (Plant Hire) Ltd has ordered 85 Mecalac site dumpers, a mix of TA1eh, TA3sh, TA6 and TA9 models.

The dumpers - produced at Mecalac’s facility in Coventry, UK, acquired from Terex two years ago – have several added features, including road lights, a green beacon seatbelt system (with ‘Start Inhibit’), and Trackunit telematics and immobilisation systems.

HEServicesMecalacPhotoCW-small

H.E. Services’ dumpers leaving the Mecalac facility in Coventry, UK.

Peter Durey, Managing Director at H.E. Services, said; “Our priority is to provide rental professionals with robust, reliable and highly-capable compact equipment to perform in the toughest conditions and deliver outstanding results.

“We have a successful working relationships with the Mecalac team. By choosing their latest site dumper models to expand our fleet, we can continue to provide our customers with reliable, productive and highly-efficient plant equipment to hire.”

Paul Macpherson, UK Sales and Marketing Director at Mecalac CEUK, added, “At Mecalac, we’re committed to developing innovative products and game-changing technologies to support rental market requirements. Our 2018 range comprises our most advanced and capable units ever – offering the perfect solution for any fleet.”

Redefining the cost of emissions compliance
As emissions rules tighten worldwide, only smarter system design can keep costs under control
An intelligent machine ecosystem: Zoomlion’s approach to the future of mining
How a combination of autonomy, remote control, electrification and digital intelligence is helping mining operators improve safety, productivity and sustainability
Will fuel-agnostic engines power the next era of construction?
Flexible engine platforms are emerging as a way to balance performance, flexibility and future regulatory demands