H.E. Services orders 85 Mecalac dumpers

Premium Content

03 December 2018

UK rental company H.E. Services (Plant Hire) Ltd has ordered 85 Mecalac site dumpers, a mix of TA1eh, TA3sh, TA6 and TA9 models.

The dumpers - produced at Mecalac’s facility in Coventry, UK, acquired from Terex two years ago – have several added features, including road lights, a green beacon seatbelt system (with ‘Start Inhibit’), and Trackunit telematics and immobilisation systems.

HEServicesMecalacPhotoCW-small

H.E. Services’ dumpers leaving the Mecalac facility in Coventry, UK.

Peter Durey, Managing Director at H.E. Services, said; “Our priority is to provide rental professionals with robust, reliable and highly-capable compact equipment to perform in the toughest conditions and deliver outstanding results.

“We have a successful working relationships with the Mecalac team. By choosing their latest site dumper models to expand our fleet, we can continue to provide our customers with reliable, productive and highly-efficient plant equipment to hire.”

Paul Macpherson, UK Sales and Marketing Director at Mecalac CEUK, added, “At Mecalac, we’re committed to developing innovative products and game-changing technologies to support rental market requirements. Our 2018 range comprises our most advanced and capable units ever – offering the perfect solution for any fleet.”

Accessing aging infrastructure: Choosing the right AWP for the application
How site conditions determine which aerial work platform is best suited to the project
The evolution of construction site safety: Why smart machines matter
Intelligent intervention that can help contractors prevent incidents without compromising productivity
How smart equipment is improving jobsite productivity
In the face of rising costs, tighter margins and labor shortages, there has never been a greater need to make the best use of every hour on site