All Marine/Offshore Articles

3,000 tonne Liebherr crane takes shape
Premium Content
Construction of offshore installation vessel Alfa Lift’s 3,000 tonne capacity Liebherr crane reached a milestone in October
Damaged Orion crane under repair
Premium Content
Repairs on damaged 5,000 tonne Liebherr crane for Orion vessel underway at Port of Rostock in Germany
Offshore crane ordered from Huisman
Premium Content
Dominion Energy commissions Huisman to make a crane for the installation of new generation wind turbines on first Jones Act compliant wind turbine installation vessel
BOS cranes for UBOC
Premium Content
Liebherr sells offshore cranes to oil company in Azerbaijan
Offshore turbine erection from OHT
Premium Content
OHT enters offshore wind turbine installation market and orders two GustoMSC jack up vessels with 2,500 tonne telescopic lattice boom cranes
Palfinger cranes for Japan
Premium Content
Fixed boom Palfinger Marine cranes ordered for Japanese offshore wind energy project
Sleipnir’s first decom job
Premium Content
Installation and decommissioning 50 years apart by Heerema on the Norwegian Ekofisk field
Virus hits Cargotec
Premium Content
First quarter sales flat but orders decline at global crane and materials equipment manufacturing group Cargotec
New CEO at Huisman
Premium Content
Third generation of Roodenburg family takes over as CEO at Huisman. Theo Bruijninckx moves to CFO position
Huisman to build 1,600 tonne crane
Premium Content
Third offshore wind installation crane for Japan to be built by Dutch crane builder Huisman
Conbit wins wind technology competition
Premium Content
Offshore modular lifting system wins Conbit funding
1,600 tonne Huisman crane order
Premium Content
Huisman to build 1,600 tonne leg-encircling crane for Fred Olsen Windcarrier
Heavy lifting: First choice
Premium Content
A series of offshore and onshore firsts comprise the core of this month’s feature. Christian Shelton reports
Offshore lifting: Water works
Premium Content
The oil and gas industry and the construction of wind farms remain the primary drivers in a buoyant offshore lifting sector. Christian Shelton reports
2020 crane rental survey: call for entries
Premium Content
Have your voice heard in our annual crane rental confidence survey
5,000 tonner for Jan De Nul
Premium Content
Dutch specialist Huisman to build 5,000 tonne tub crane for Jan de Nul’s latest offshore installation vessel
Giant Huisman crane for Boskalis
Premium Content
Huisman will build a 4,000 tonne offshore mast crane for the Royal Boskalis Westminster Bokalift 2 heavy lift vessel
Double digit rises at Palfinger
Premium Content
Palfinger increased revenue by 10% in the first three quarters of 2019
Strong rise at Cargotec
Premium Content
Double digit sales increase for Cargotec in first three quarters of 2019
Wind turbine erection: Ecological warriors
Premium Content
As seen in last month’s issue, the wind sector is busy overall and new installation equipment is being developed. Christian Shelton reports on the latest developments
Load More