Understanding battery capacity and expected life

05 July 2017

Chart

Chart

Maintaining a fleet of battery-powered aerial work platforms and related access equipment that operate at peak efficiency requires knowing how long the batteries will last between recharges on each piece of equipment. To do this, one needs to understand the many factors that affect battery capacity. A battery’s capacity is usually specified as either the runtime in minutes or the amp-hour capacity that the battery can deliver under a specified load or for a specified period of time. Battery manufacturers indicate this as a series of ratings on the battery’s label and/or in a specification sheet.

Determining the actual available capacity of any deep-cycle, flooded lead-acid battery, however, is not that simple. There are other factors that need to taken into consideration to properly determine the battery’s expected runtime or capacity and its expected life.

Factors affecting battery capacity

Knowing that batteries will deliver a limited amount of energy before they need to be recharged, it’s important to understand some factors that can affect the actual capacity that the battery can deliver. A new battery, for example, will not reach its peak or full-rated capacity until the battery has undergone several cycles of charging and discharging. Deep cycle batteries often require as many as 75-125 cycles to reach their full-rated capacity. Batteries with optimized design features, however, can reach full-rated capacity in as few as 25 cycles. A new deep cycle battery will usually give 65-75 percent of rated capacity during the first few cycles.

Us battery 1

In order to achieve maximum battery capacity over the life of your fleet, begin by making sure the batteries are fully charged before they are put into use.

The most important factor affecting battery capacity and runtime is the size of the discharge load in comparison to the size of the battery. This is important in understanding how to size the battery for the application and affects not only operation time in the application but also overall service life. Rated capacity is usually specified as the number of minutes the battery will deliver at a fixed current of 25, 56, or 75 amps. Another type of rating is an hourly rating, which is the amp-hour capacity at an hourly rating at 20 hours, 10 hours, 8 hours, 5 hours or some other fixed time. To determine the discharge rating from an hourly rating, simply divide the amp-hour capacity by the hourly rating.

For example, if a battery is rated at 200 amp-hours at the 20-hour rate, the discharge rate would be 200 Ah / 20 hours = 10 amps.

Temperature also affects a battery’s capacity. For deep cycle batteries, the optimum temperature of the electrolyte during service is 80°F and is the standard at which ratings are determined. It’s important to know that for every 20 degrees below 80°F, the battery loses 10-12 percent of its available capacity. On the opposite side, electrolyte temperatures above 80°F will increase the battery’s performance by roughly the same figure. Operation at higher temperatures may give you more runtime, but it will also shorten overall battery life.

Achieving maximum capacity

In order to achieve maximum battery capacity over the life of your fleet, begin by making sure the batteries are fully charged before they are put into use. Secondly, make sure the batteries receive regularly scheduled maintenance. This includes proper watering, opportunity charging and performing an equalization charge after the first discharge and recharge (cycle) and once every 30 days during regular use.

Another way to maintain maximum battery capacity and to extend battery cycle life is to manage the level of each discharge. By limiting the depth of discharge (DOD) before charging you can improve the cycle life of the battery. A common misconception is to allow the battery pack to be fully discharged before charging. Most battery manufacturers recommend a 50 percent DOD for optimum cycle life vs runtime. (See chart.)

Latest News
EquipmentShare mulls US IPO in 2025
Construction equipment rental company equipment share could go public as early as next year (2025), according to a report by Bloomberg.
New Teupen spider for multiple markets
Product aimes at US market follows Teupen’s acquisition by Altec
Dragon crushers continuing to gain in popularity
Company owner and director presents the CR400 model to Intermat crowds