International Construction September 2017 podcast

Premium Content

21 September 2017

In the September 2017 podcast from International Construction, editor Mike Hayes and deputy editor Thomas Allen summarise the major news stories from the latest edition. This month, plans for the expansion of two nuclear power stations in South Carolina are abandoned and start-up firm Kolos looks to build the world’s largest data centre in the Arctic Circle. In other news, engineering firm Jacobs acquires rival firm CH2M for US$2.78 billion and installation of the world’s first floating wind farm begins off the coast of Scotland.

How smart equipment is improving jobsite productivity
In the face of rising costs, tighter margins and labor shortages, there has never been a greater need to make the best use of every hour on site
What smarter cooling can do for the next generation of heavy equipment
Rethinking airflow, not simply adding capacity, is unlocking efficiency, uptime and better machine performance.
Meeting the data center power challenge… with batteries
Could battery energy storage systems (BESS) power the AI data center era?