TBM dismantled by Gradito

Premium Content

11 April 2018

Italian crane contractor Gradito Oleodinamica used its 500 tonne capacity class Liebherr LR 1500 crawler crane to dismantle a large tunnel boring machine (TBM) on the Italian island of Sicily.

Liebherr lr 1500 gradito 1 300dpi

Gradito said its LR 1500 is flexible and has compact dimensions

The tunnel boring machine had been used to widen a main road near Porto Empedocle and needed to be dismantled in restricted conditions. “The LR 1500 was ideal for this job as a result of its compact dimensions and remarkable flexibility,” said company owner Angiolino Gradito. “The constricted working conditions made moving and positioning the components, which weighed up to 370 tonnes, a real challenge. The sensitive Liebherr crane control was invaluable for this work.”

According to Liebherr, when designing the crane, it focussed on making it compact and powerful. Liebherr also said it designed the setup processes and crane operation to be as simple and economical as possible. Liebherr added that the crane’s transport weight of 46.7 tonnes means it can be transported around the world without restrictions.

Liebherr lr 1500 gradito 2 300dpi

The crane has a transport weight of 46.7 tonnes

How to influence construction buyers in an AI world
The buyer journey is now more complicated than ever before, thanks to the AI world. What should construction marketers do to reach their buyers?
A smart cold play: How cold milling can offer a better bottom line for Latin American road contractors
Faced with tight margins, operator shortages and calls for more operational transparency, highway contractors are embracing digitalisation in their cold milling applications
How smarter milling can boost productivity for Latin American road contractors
As contractors across the region face tighter margins, operator shortages and growing demands for transparency, automation and digitalisation are becoming increasingly important in cold milling operations