International Cranes and Specialized Transport

Premium Content

08 April 2013

IC April 2013

 

Supporting documents

Click links below to download and view individual files.

 
IC April 2013 Size: 46.1 MB Click to download
How a modular test system overcame a genset bottleneck
When rising demand threatened to outpace a genset manufacturer’s testing capacity, a modular test cell bridged the gap – and laid the groundwork for future growth.