Aaras busy in cargo handling

Premium Content

04 January 2017

Loading one of 684 power and construction packages onto MV Han Ren by Aaras Shipping

Loading one of 684 power and construction packages onto MV Han Ren by Aaras Shipping

Aaras Project and Logistics Pakistan Private, a member of the Worldwide Project Consortium for Pakistan, has reported several project shipments which its sister company Aaras Shipping handled during November 2016.

Six breakbulk vessels filled with a range of project cargo with a total weight of 107,215 tonnes got discharged in Karachi and the cargo was moved onwards by Aaras.

Most of this cargo consisted of oversized and heavy items, and included hot dipped galvanised steel coils, seamless steel casing pipes, low carbon steel wire rod, bulldozers and accessories.

Smarter by design: How intelligent excavators are delivering better jobsite results
Integrated technology is helping contractors improve accuracy, productivity and control without neglecting the fundamentals of machine performance
Choosing the right AWP for a constrained jobsite
A look at how site restrictions and task requirements inform aerial platform selection
The right tire for the right application
When the demands of a jobsite dictate tire selection, field knowledge and data are key to optimising fleet performance