Aaras busy in cargo handling

Premium Content

04 January 2017

Loading one of 684 power and construction packages onto MV Han Ren by Aaras Shipping

Loading one of 684 power and construction packages onto MV Han Ren by Aaras Shipping

Aaras Project and Logistics Pakistan Private, a member of the Worldwide Project Consortium for Pakistan, has reported several project shipments which its sister company Aaras Shipping handled during November 2016.

Six breakbulk vessels filled with a range of project cargo with a total weight of 107,215 tonnes got discharged in Karachi and the cargo was moved onwards by Aaras.

Most of this cargo consisted of oversized and heavy items, and included hot dipped galvanised steel coils, seamless steel casing pipes, low carbon steel wire rod, bulldozers and accessories.

Accessing aging infrastructure: Choosing the right AWP for the application
How site conditions determine which aerial work platform is best suited to the project
The evolution of construction site safety: Why smart machines matter
Intelligent intervention that can help contractors prevent incidents without compromising productivity
How smart equipment is improving jobsite productivity
In the face of rising costs, tighter margins and labor shortages, there has never been a greater need to make the best use of every hour on site