Glass work at the institute

Premium Content

18 May 2015

Mateco was employed for cleaning work at the International Neuroscience Institute in Hannover, Germany.

The building is 38m high with a facade area of more than 6000 square metres, consisting of numerous glass elements. Such a large glass facade requires extensive maintenance and cleaning, which would be more difficult without the help of modern access equipment, said Mateco.

Mateco used two compact crawler mounted INI lifts, an XT 302 and XT 422. To reach the higher areas an LT 540 KD truck mount was used.

Southwest Industrial Rigging gets new owner and leadership team
Entering a new era but aspiring to continue Harry Baker’s legacy
Trail King debuts automatic kingpin steering trailers
New trio hailed as a fundamental shift in heavy-haul equipment design
How a modular test system overcame a genset bottleneck
When rising demand threatened to outpace a genset manufacturer’s testing capacity, a modular test cell bridged the gap – and laid the groundwork for future growth.