Kemroc attachments help remove tunnel
24 September 2020
Experts at German demolitioncompany Fischer Weilheim developed a method for the removal of thick concrete tunnel lining in a tram tunnel in Stuttgart.
To begin with, the depth of roughly 1.6 m (5 ft) thick concrete…