Record turbine blade transportation

01 September 2020

The Port of Vancouver USA used its heavylift cranes to offload a shipment of wind turbine components including what it claimed to be the longest wind turbine blades ever to enter the West Coast of the USA and be transported across North America to-date.

At 76 metres long…