Transport of gas equipment

Premium Content

01 September 2020

Mumbai, India-headquartered logistics specialist Express Global Logistics transported a 38-metre long Amine gas treatment regenerator approximately 1500 kilometres from north west India to south east India. The journey took 30 days. To move the equipment a 14-axle trailer with a 10 metre spacer in the middle was used. A detailed route survey was carried out prior to the transport job and challenges included rough terrain, steep gradients, tight turns and obtaining multiple permissions. The transport also took place over a period of national lockdown in India, adding to the challenges.

2

The Amine gas treatment regenerator measured 38 metres long

1AAA

A 14-axle trailer with a 10 metre spacer in the middle was used

4

Challenges on the route included rough terrain, steep gradients, tight turns and obtaining multiple permissions

3

The journey took 30 days

 

 

The changing role of compact excavators on modern jobsites
As urban construction becomes more restricted and operator expectations rise, compact excavators are taking on a more strategic role across contractor fleets
Bobcat innovation leader to speak at industry electrification webinar
Joel Honeyman will discuss the practical realities of bringing electrification into off-highway equipment, at February 17 event
From scale to flexibility: Inside the development of Zoomlion’s Smart Factory
Mr Shi Heng, assistant to the general manager of Zoomlion Zvally Co Ltd, on the future of heavy equipment manufacturing