WDS 2019 - Rodd Palon, President, Two Rivers Demolition

Premium Content

06 December 2019

09-Rodd-Palon-Two-Rivers-Demo-With-Facade-Retention-3x2

Click here to download the presentation

Supporting documents

Click links below to download and view individual files.

 
Rodd Palon - Two Rivers - Demo With Facade Retention Size: 10.9 MB Click to download
Less effort, better compaction
Efficient compaction isn’t about doing more work – it’s about knowing where the work adds value
Cutting the scrap: The true cost of a demolition shear
A lower-cost shear can be tempting, but what might contractors discover when they do their due diligence?
Streamlining the project lifecycle: The advantage of connected construction
​​​Meaningful site data​​​​​​ help​s​ contractors reduce rework, improve decisions and deliver with greater certainty