Ace Tree puts new Barin to the test

Premium Content

26 February 2013

Ace Tree Management’s new Barin AP 70/33 J2 aerial platform gets to work

Ace Tree Management’s new Barin AP 70/33 J2 aerial platform gets to work

Australian rental firm Ace Tree Management has put its latest fleet addition, a Barin AP 70/33 J2 truck mount, out to work at the Wonthaggi Wind Farm in Victoria.

The 70 m platform is being used for inspection and maintenance works on the six wind turbines at the plant.

The AP 70/33 J2 is mounted onto a five-axle DAF FADCF75 truck chassis. The upper structure is a bucket-type aerial platform, capable of achieving an overhead working height of 70 m or a lateral outreach of 33 m. The platform has a safe working load of 400 kg.

A modem system enables Barin to check the electronics and make adjustments from Italy.

How smart technology is changing the crawler dozer workplace
Technology is helping dozer operators work more safely, accurately and consistently
Have your say: Help shape the State of Marketing 2027 report
Have your say: Help shape the State of Marketing 2027 report
WorkDry invests in pump fleet in preparation for extreme events
Company adds hundreds of new pumps in anticipation of extreme El Niño weather events.