AECOM-STV wins New Jersey bridge replacement project

Premium Content

07 April 2010

The AECOM-STV joint venture (JV) has won a US$ 18 million contract for New Jersey Transit Board's Portal Bridge Capacity Enhancement project.

The JV will provide construction management services for the estimated US$ 1.7-billion project that will replace the two-track, 99-year-old Portal Bridge swing span over the Hackensack River on Amtrak's Northeast Corridor.

Two new two-track and three-track fixed bridges will replace the existing structure, on the busiest section of passenger rail mainline in North America.

Construction is expected to start later this year with completion due in 2017.

The evolution of electromobility in construction
The case for electric construction equipment is now as much about productivity and business value as it is about sustainability
Why crawler AWPs are becoming essential to modern mining and tunnelling
While excavators, loaders and TBMs dominate the spotlight, crawler aerial work platforms are quietly transforming how mining and tunnelling projects are built, maintained and operated.
Beyond the logo: Why content is the engine of successful B2B brand transformation
KHL Content Studio’s Jon Abrahams on how a new identity may capture attention, but it’s understanding that builds trust