AFI booms assist steel erectors in Liverpool

By Sarah McCay15 September 2014

Two of the AFI boom lifts in action at the Exhibition Centre Liverpool.

Two of the AFI boom lifts in action at the Exhibition Centre Liverpool.

AFI recently responded to a last-minute request to supply boom lifts to steel erector Wisconco, working on the steelwork for a new £50 million (US$ 80 million) exhibition centre being built in Liverpool.

Wisconco hired four JLG 800AJ articulating booms, fitted with the SkyGuard secondary guarding system. The boom lifts have a working height of 26.38 m and a horizontal outreach of 15.74 m, giving Wisconco the range of movement, reach and versatility required to enable its operatives to erect the steelwork safely and efficiently.

The new development, called Exhibition Centre Liverpool, will be connected to the Liverpool Arena and Convention Centre and will more than double the exhibition space available.

Latest News
How did Saudi Aramco perform this major lift at Fadhili gas plant?
Early 2021 saw a critical lift performed at the Fadhili gas plant in Saudi Arabia when a reboiler tube was removed for inspection. Mustafa Al Abdulmohsin reports
Onshore construction completed for Triton Knoll
UK’s longest ever offshore wind cabling project concludes after three years
Sinoboom to give away scissor at ARA Show
Sinoboom North America will be giving away a Sinoboom 1330SE electric scissor lift in celebration of attending its first ARA Show