ai01020611.xml

24 April 2008

Platform positioning flexibility within a maximum 37 m working height and 28 m outreach is a key feature of Anton Ruthmann's new 18 t GVW, 500 kg capacity Steiger T 370. Its lower boom telescopes 12.1 m and rotates through 500°, the upper boom telescopes 3.7 m and articulates through 180° and a 1.8 m cage arm articulates also through 180° to position a 3.6 x 0.9 m extendable cage. Ruthmann has also strived to maximize site accessibility; a stowed length of 8.8 m, a 4.8 m wheelbase, and high-stroke outrigger jacks enhance the vehicle's manoeuvrability and positioning flexibility. Delivery time for the unit is currently four months.

Latest News
Desreumaux named CEO at Uperio Group
Sébastien Desreumaux replaces Philippe Cohet, founder of Uperio Group.
Friday round up: Tower cranes, TopLift 2024 and telecrawlers
A summary of the lead stories in the Crane & Transport Briefing 30 September to 4 October 2024.
New tender worth up to US$1 billion offered on Rail Baltica
Major infrastructure projects in Estonia unveiled on huge European transport network