ai04050616.xml

Premium Content

24 April 2008

Main contractor Connor Company used several Hydro Mobile F–Series mast climbers to help replace the façade and windows on the J Murrey Atkins Library at the University of North Carolina in Charlotte, US. The project was complicated by a podium building design, with the upper seven floors set back from the lower three floors of the building. The climbers were placed on steel beams installed on the roof of the third storey.

The evolution of electromobility in construction
The case for electric construction equipment is now as much about productivity and business value as it is about sustainability
Why crawler AWPs are becoming essential to modern mining and tunnelling
While excavators, loaders and TBMs dominate the spotlight, crawler aerial work platforms are quietly transforming how mining and tunnelling projects are built, maintained and operated.
Beyond the logo: Why content is the engine of successful B2B brand transformation
KHL Content Studio’s Jon Abrahams on how a new identity may capture attention, but it’s understanding that builds trust