alh03040722.xml

Premium Content

25 March 2008

Formwork specialist Doka and hoist and platform manufacturer Geda have jointly developed a formwork Table Lifting System (TLS) that received its official launch at the World of Concrete show in Las Vegas. The Gedadesigned, electrically powered system provides an alternative to cranes for raising formwork panels, and has a platform of 9 feet by 16 feet and takes 20 seconds to move the 12 feet between floors.

How to influence construction buyers in an AI world
The buyer journey is now more complicated than ever before, thanks to the AI world. What should construction marketers do to reach their buyers?
A smart cold play: How cold milling can offer a better bottom line for Latin American road contractors
Faced with tight margins, operator shortages and calls for more operational transparency, highway contractors are embracing digitalisation in their cold milling applications
How smarter milling can boost productivity for Latin American road contractors
As contractors across the region face tighter margins, operator shortages and growing demands for transparency, automation and digitalisation are becoming increasingly important in cold milling operations