alh03040722.xml

Premium Content

25 March 2008

Formwork specialist Doka and hoist and platform manufacturer Geda have jointly developed a formwork Table Lifting System (TLS) that received its official launch at the World of Concrete show in Las Vegas. The Gedadesigned, electrically powered system provides an alternative to cranes for raising formwork panels, and has a platform of 9 feet by 16 feet and takes 20 seconds to move the 12 feet between floors.

Smarter by design: How intelligent excavators are delivering better jobsite results
Integrated technology is helping contractors improve accuracy, productivity and control without neglecting the fundamentals of machine performance
Choosing the right AWP for a constrained jobsite
A look at how site restrictions and task requirements inform aerial platform selection
The right tire for the right application
When the demands of a jobsite dictate tire selection, field knowledge and data are key to optimising fleet performance