alh05060730.xml

Premium Content

20 March 2008

This TEL–34–NE is one of two new chassis mounted Versalift platforms from Time Export – Time Manufacturing's Danish subsidiary. It has a 12.2 meter (40 foot) working height, comes without a fly jib, and with a bottom–mounted rotating cage. The platform capacity is 120 kg (260 pounds) and no outriggers are required (although outriggers are needed if capacity rises to 200 kg). Per Torp, Time Export's managing director, says the unit – and its 11 meter (36 feet) TEL–30 sister model – will be ideal for small vans and pick–ups.

How to influence construction buyers in an AI world
The buyer journey is now more complicated than ever before, thanks to the AI world. What should construction marketers do to reach their buyers?
A smart cold play: How cold milling can offer a better bottom line for Latin American road contractors
Faced with tight margins, operator shortages and calls for more operational transparency, highway contractors are embracing digitalisation in their cold milling applications
How smarter milling can boost productivity for Latin American road contractors
As contractors across the region face tighter margins, operator shortages and growing demands for transparency, automation and digitalisation are becoming increasingly important in cold milling operations