ALS transports Terex 883 to Kazakhstan

Premium Content

18 March 2014

The Terex 883 ready for transportation

The Terex 883 ready for transportation

A recent project for WWL ALS, a specialist in global logistics and freight forwarding, was the transport of a Terex 883 tracked screen machine from Ireland to Kazakhstan.

The machine weighed 32 tonnes and was 14.7 metres long, 3 m wide and 3.4 m high. For the first stage of the project, the machine was transported from a factory in Northern Ireland to a storage unit ready for shipment.

Once it was ready to be shipped, the machine was transported using a semi-low loader to a UK port and loaded onto a vessel. From here it was shipped to Estonia. On arrival the machine was transported via rail to a dispatch location ready to be taken to its final location in Kazakhstan.

How to influence construction buyers in an AI world
The buyer journey is now more complicated than ever before, thanks to the AI world. What should construction marketers do to reach their buyers?
A smart cold play: How cold milling can offer a better bottom line for Latin American road contractors
Faced with tight margins, operator shortages and calls for more operational transparency, highway contractors are embracing digitalisation in their cold milling applications
How smarter milling can boost productivity for Latin American road contractors
As contractors across the region face tighter margins, operator shortages and growing demands for transparency, automation and digitalisation are becoming increasingly important in cold milling operations