APS provides platforms for huge bridge strengthening project

Premium Content

20 September 2010

APS Contract Services is one of Australia's largest temporary suspended access providers. The company specialises in heavy duty space frame platforms, which are commonly known as Technitruss Platforms.

APS is currently completing the West Gate Bridge strengthening Project where it is contracted to provide suspended access platforms for the work on strengthening the underside of the bridge. 16 suspended access platforms have been provided offering 7000 sqm of suspended work area, capacity for platform mounted cranes which lift materials and equipment in and out of the worksite and full lunching and toilet facilities on the platforms.

APS says that the suspended access platforms at the West Gate Bridge are the largest access project in Australia at the moment.

To read more about the project see the September/October issue of Access International.

How to influence construction buyers in an AI world
The buyer journey is now more complicated than ever before, thanks to the AI world. What should construction marketers do to reach their buyers?
A smart cold play: How cold milling can offer a better bottom line for Latin American road contractors
Faced with tight margins, operator shortages and calls for more operational transparency, highway contractors are embracing digitalisation in their cold milling applications
How smarter milling can boost productivity for Latin American road contractors
As contractors across the region face tighter margins, operator shortages and growing demands for transparency, automation and digitalisation are becoming increasingly important in cold milling operations