APS provides platforms for huge bridge strengthening project

Premium Content

20 September 2010

APS Contract Services is one of Australia's largest temporary suspended access providers. The company specialises in heavy duty space frame platforms, which are commonly known as Technitruss Platforms.

APS is currently completing the West Gate Bridge strengthening Project where it is contracted to provide suspended access platforms for the work on strengthening the underside of the bridge. 16 suspended access platforms have been provided offering 7000 sqm of suspended work area, capacity for platform mounted cranes which lift materials and equipment in and out of the worksite and full lunching and toilet facilities on the platforms.

APS says that the suspended access platforms at the West Gate Bridge are the largest access project in Australia at the moment.

To read more about the project see the September/October issue of Access International.

Product launch update: new tower cranes
New tower cranes launched into the North American market this year
Why rugged electronics are becoming mission-critical for off-road OEMs
Connectivity and digital controls are reshaping heavy equipment and manufacturers are finding performance depends as much on durable electronics as on the vehicles themselves
How less can be more: Rethinking cooling system design for modern heavy equipment
Smarter airflow, not bigger systems, is aiding engine efficiency and uptime