Barin delivers to Norway

Premium Content

23 September 2016

Barin AB 20/S working in the Drammen area of Norway.

Barin AB 20/S working in the Drammen area of Norway.

A Barin underbridge inspection unit has been delivered to Norwegian rental company Drammen Liftutleie, Based in Drammen.

The bucket-type machine was manufactured in Italy and assembled on a man TGS 26.440 6x2-2 LL truck chassis and completes the requirements of the rental company’s fleet.

The AB 20/S can be used on a single lane of the highway, freeing the other ones up, and can be used below ground and above it like a conventional work platform.

It has a bridge barrier clearance of 4m, sidewalk clearance of 3m and horizontal outreach of 20m. Maximum vertical depth underbridge is 23.80 m, while basket capacity is 300kg. Gross vehicle weight is 26 tonness.

How to influence construction buyers in an AI world
The buyer journey is now more complicated than ever before, thanks to the AI world. What should construction marketers do to reach their buyers?
A smart cold play: How cold milling can offer a better bottom line for Latin American road contractors
Faced with tight margins, operator shortages and calls for more operational transparency, highway contractors are embracing digitalisation in their cold milling applications
How smarter milling can boost productivity for Latin American road contractors
As contractors across the region face tighter margins, operator shortages and growing demands for transparency, automation and digitalisation are becoming increasingly important in cold milling operations