Barin sets up on Thuan Phuoc

19 May 2016

Barin AB 16/S on the Thuan Phuoc Bridge in Thailand. 

The bucket-type

Barin AB 16/S on the Thuan Phuoc Bridge in Thailand. The bucket-type

A new bridge inspection unit from Barin has been put to work on the Thuan Phuoc Bridge in Thailand.

The bucket-type AB 16/S is mounted on a Volvo FM, 370 hp chassis. Its main technical features include a horizontal underbridge reach of 16m, maximum overhead reach of 18.4m, vertical depth unberbridge of 21.6m and the ability to operate over 3.9 m barriers and a sidewalk clearance of 3.8m. Payload is 250 kg.

It was delivered at the beginning of May to customer Danang Municipality mainly for the inspection of the famous Da Nang (Dragon Bridge). But, for now, is working on the Thuan Phuoc, a suspension bridge spanning the Han River, which flows into Danang Bay.

The bridge’s length is 1856m, making it the longest suspension bridge in Vietnam, boasting a width of 18m and four traffic lanes.

Latest News
EquipmentShare mulls US IPO in 2025
Construction equipment rental company equipment share could go public as early as next year (2025), according to a report by Bloomberg.
New Teupen spider for multiple markets
Product aimes at US market follows Teupen’s acquisition by Altec
Dragon crushers continuing to gain in popularity
Company owner and director presents the CR400 model to Intermat crowds