Barin under the bridges in Taipei

Premium Content

05 June 2013

Barin ABC 110/L underbridge unit in Taipei City, Taiwan

Barin ABC 110/L underbridge unit in Taipei City, Taiwan

Barin has supplied an underbridge inspection unit to the Taiwan highway authority.

The ABC 110/L is being used by the Directorate General of Highways MOTC for the maintenance of bridges in Taipei City, the capital of Taiwan.

Manufactured in Italy, the ABC 110/L is mounted on a Mercedes Benz 2636 Actros truck chassis. It has an underbridge working depth of 7.1 m and working length of 11 m. The maximum width is 2.5 m and can negotiate footpaths up to 2.3 m wide and wind/noise barriers up to 1.6 m high.

The model started work in Taipei at the beginning of May.

Istanbul – the world’s next meeting place
Levent Baykal, organiser of Komatek, the largest construction exhibition in Türkiye, talks to KHL’s Content Studio about his plans to put people at the heart of the show
The future of off-highway power is about integration, not just innovation
OEMs face growing complexity in powertrain decisions – but clarity is emerging around efficiency and uptime
A Chinese OEM’s view of construction equipment today – and tomorrow
LiuGong’s Andrew Ryan believes forward-thinking OEMs must combine local execution, useful tech and a greater focus on total cost of ownership