Bisso umbilical load in

Premium Content

26 February 2010

Marine and energy services specialist Bisso Marine loaded a 281 tonne umbilical reel onto an offshore installation vessel in the Gulf of Mexico.

Using the 700 tonne capacity D/B Cappy Bisso crane barge, the crew loaded the umbilical reel from shore to the installation vessel. It was then transported to a deepwater location 190 miles (306 km) south of New Orleans.

How to influence construction buyers in an AI world
The buyer journey is now more complicated than ever before, thanks to the AI world. What should construction marketers do to reach their buyers?
A smart cold play: How cold milling can offer a better bottom line for Latin American road contractors
Faced with tight margins, operator shortages and calls for more operational transparency, highway contractors are embracing digitalisation in their cold milling applications
How smarter milling can boost productivity for Latin American road contractors
As contractors across the region face tighter margins, operator shortages and growing demands for transparency, automation and digitalisation are becoming increasingly important in cold milling operations