Bluelift masters the metro in Cologne

Premium Content

23 July 2015

Blue Lithium SA22 (R220C) tracked platforms at the North-South metro tunnel in Cologne.

Blue Lithium SA22 (R220C) tracked platforms at the North-South metro tunnel in Cologne.

Rothlehner Arbeitsbühnen, the German dealer for Bluelift, has delivered two Blue Lithium SA22(R220C) tracked platforms to Kölner Verkehrsbetriebe, working at the new north-south metro tunnel in the German city of Cologne.

The lifts are being used to carry out cleaning and maintenance work on the Heumarkt interchange station and other locations in the subway.

The station lies 27 m below ground, making it the city’s deepest station. One of the SA22 units was lowered into the subway by crane. There were strict demands when it came to reach and ground pressure.

The SA22 offers up to10.5 m of outreach with an up and over height of up to 8.5 m, while platform capacity is 230 kg with a fiberglass basket. It is also insulated to1000V. The model can also be stabilised in area of 4 m, 3 m or 2 m without losing maximum outreach.

First expert speaker announced for power transition webinar
Moog Construction’s Dr Nate Keller to join panel for February 17 event
Is total cost of ownership now the real measure of equipment value?
As sustainability pressures, technology and rising operating costs reshape construction economics, contractors are looking beyond purchase price to understand what machines truly cost over their lifetime
How Donaldson is putting the seal on innovative filtration
When you’re working with machinery, uptime is money – so why allow downtime on a jobsite to be triggered by something as unglamorous as an air filter?