Bridge piles

Premium Content

25 April 2008

South Korean contractor Tuksu has used PTC’s 240HD (Heavy Duty) pile driver during construction of a new bridge between the island of Incheon and the Korean mainland.

The 240HD is currently driving 2.4 m and 3 m diameter casings, with wall thicknesses of 19 and 22 mm respectively, to a depth of 50 m. The pile driver features four 250 tonne clamps mounted directly under the gear box, powered by the PTC 1900 (1800 hp/1343 kW) power pack. This allows it to drive or extract heavy casings up to 3.6 m diameter to depths of 60 m.

How smart technology is changing the crawler dozer workplace
Technology is helping dozer operators work more safely, accurately and consistently
Have your say: Help shape the State of Marketing 2027 report
Have your say: Help shape the State of Marketing 2027 report
2027 European Rental Awards open for entries
Includes new awards category for ‘People’ initiatives. Deadline for entries is 26 February 2027.