Bridge piles

Premium Content

25 April 2008

South Korean contractor Tuksu has used PTC’s 240HD (Heavy Duty) pile driver during construction of a new bridge between the island of Incheon and the Korean mainland.

The 240HD is currently driving 2.4 m and 3 m diameter casings, with wall thicknesses of 19 and 22 mm respectively, to a depth of 50 m. The pile driver features four 250 tonne clamps mounted directly under the gear box, powered by the PTC 1900 (1800 hp/1343 kW) power pack. This allows it to drive or extract heavy casings up to 3.6 m diameter to depths of 60 m.

2027 European Rental Awards open for entries
Includes new awards category for ‘People’ initiatives. Deadline for entries is 26 February 2027.
WorkDry invests in pump fleet in preparation for extreme events
Company adds hundreds of new pumps in anticipation of extreme El Niño weather events.
Smarter by design: How intelligent excavators are delivering better jobsite results
Integrated technology is helping contractors improve accuracy, productivity and control without neglecting the fundamentals of machine performance