Changes in rental rates over the LAST 12 months

Premium Content

15 April 2008

Decreased Same Increased
Africa 50 0 50
Australia/NZ 0 75 25
Central/S America 11 67 22
Europe/CIS 0 18 82
Middle East 17 17 67
North America 6 31 61
South Asia 0 22 78
Beyond the prototype: How simulation can reduce equipment lifecycle costs
Connecting design, testing and service can help manufacturers improve machine performance and reduce repeated engineering work
The right tire for the right application
When the demands of a jobsite dictate tire selection, field knowledge and data are key to optimising fleet performance