Davits at the weather domes

Premium Content

06 May 2008

In the US the National Ocean and Atmospheric Administration has taken delivery of 160 new davit cranes for material handling and maintenance on Nexrad weather domes.

The cranes, supplied by Allied Power Products, have 400 lb (181 kg) capacity Columbia AC mains wire rope hoists spooled with 115 ft (35 m) of 5/32 in (4 mm) wire rope. APPI claims the 25 ft/min (7.62 m) hoisting speed reduces the time to hoist materials to the working levels of the radar platforms by a factor of at least four.

Modapower targets the North American power gap
An object lesson in adapting gensets to local rules, applications and lead-time pressures – key factors in a successful market entry
Building operational resilience in industrial engine applications
The hidden costs of equipment downtime start long before failure
Parked in plane sight: Why GSE fleets rely on large spark-ignited engines
Examining how proven technology can help airport fleets balance uptime, cost, flexibility and lower emissions