Exchange rates – value of US

Premium Content

11 April 2008

Currency Value at start Value at end Change % Change Value 12 mths ago 12 month % change
YEN 113.94 108.54 5.40 –4.74 115.93 –6.37
0.7024 0.6744 -0.0280 -3.99 0.7645 -11.79
0.4880 0.4858 -0.0022 -0.46 0.5177 -6.17
Period: Week 43 – 47 Palfinger 4 for 1 stock split in week 27 2007
Manitowoc 2 for 1 stock split in week 37 2007
Accessing aging infrastructure: Choosing the right AWP for the application
How site conditions determine which aerial work platform is best suited to the project
The evolution of construction site safety: Why smart machines matter
Intelligent intervention that can help contractors prevent incidents without compromising productivity
How smart equipment is improving jobsite productivity
In the face of rising costs, tighter margins and labor shortages, there has never been a greater need to make the best use of every hour on site