FCC Liebherr lifts for Niagara Falls

Premium Content

18 November 2013

The Liebherr fixed cargo crane has been painted turquoise to match the colour of the water of the Ni

The Liebherr fixed cargo crane has been painted turquoise to match the colour of the water of the Niagara River

American tour company, Maid of the Mist, is using a Liebherr fixed cargo crane (FCC) to maintain passenger tour boats at the site of Niagara Falls in New York State, USA.

The tour boats, which can carry up to 600 people, are used to take passengers to the bottom of the Niagara Falls waterfall. The FCC, which has been installed at a new dockside facility, is used to lift the boats out of the water during winter for maintenance and for winter storage. It then lifts the boats back into the water at the start of the spring season. The FCC has a lifting capacity of 200 tonnes at a radius of 15 metres. Maximum outreach is 24 m.

The crane forms part of a US$ 32 million renovation project of the dockside at the Niagara Falls site.

How to influence construction buyers in an AI world
The buyer journey is now more complicated than ever before, thanks to the AI world. What should construction marketers do to reach their buyers?
A smart cold play: How cold milling can offer a better bottom line for Latin American road contractors
Faced with tight margins, operator shortages and calls for more operational transparency, highway contractors are embracing digitalisation in their cold milling applications
How smarter milling can boost productivity for Latin American road contractors
As contractors across the region face tighter margins, operator shortages and growing demands for transparency, automation and digitalisation are becoming increasingly important in cold milling operations